Skip to content

Create a project with a summary and a target date in Linear

Linear shows a project creation modal with inline properties and a target date picker, offering a reference for configuring a project before opening its overview. The flow takes 8 screens, from “Project list” to “Saved project overview”, and the video shows every interaction between them.

  • 8 screens
  • Video
  • 1280×800
  • Captured October 23, 2026
A recording of create a project with a summary and a target date in Linear

What the flow shows

  • The large dialog groups the project name and short summary above chips for status, priority, ownership, dates, labels and dependencies.
  • The Target date popover combines a text field, date granularity choices and a month calendar.
  • A Milestones section sits above the fixed lower action row, leaving most of the dialog available for a description.
  • The resulting project appears in the table with its icon and target date, then opens into an overview with right-side property cards.
  • modal dialog
  • property chips
  • date picker
  • data table
  • side panel

Every step

  1. Linear Projects table with columns for name, health, priority, lead, target date, issues and status.
    Step 1 Project list
  2. New project modal with name and summary fields, property chips, a description area and Milestones section.
    Step 2 New project form
  3. Keyboard navigation refresh entered as the project name in the creation modal.
    Step 3 Project name entered
  4. Project name and short summary entered above the property chips.
    Step 4 Project summary entered
  5. Target date popover with date input, granularity choices and an October 2026 calendar.
    Step 5 Choose target date
  6. Project form with a teal icon and an October 30 target date chip.
    Step 6 Target date selected
  7. Projects table with the new project row showing its teal icon and October 30 target date.
    Step 7 Project created in the list
  8. Project overview with title, summary, resources and update prompt beside property and milestone cards.
    Step 8 Saved project overview

Similar flows

Content Planner with an October 2026 calendar, month controls, filters and illustrated learning shortcuts. Create a sample calendar event Canva · 6 screens Canva Projects folder view with breadcrumbs, a search field, sort controls and a presentation card. Create a nested project folder Canva · 4 screens Convex project directory with Projects and Deployments tabs, search, view controls and a Create Project button. Create a project and development deployment Convex · 6 screens Convex Data view with a no-tables message over a muted table illustration and a Create Table link. Create a table Convex · 3 screens Agent skill form with a Skill name placeholder, large instructions area and Cancel and Create buttons. Create a reusable keyboard review skill Linear · 4 screens New document template page with a title placeholder, writing prompt and Cancel and Create controls. Create a reusable release checklist Linear · 4 screens

More Linear flows

Give your agent the same designs

Add the Longwave design MCP server to Claude Code, Codex, Cursor or ChatGPT. Your agent can list these websites and flows, read every step and open any screen as an image before it builds. It is free; your agent asks you to sign in to Longwave the first time it connects.

Add design inspiration to your agent

Paste this into Claude Code or a terminal. Then run /mcp to sign in.